Business Risk Assessment: The 6 Categories
Hazadio assesses your business's vulnerability across 6 complementary risk categories. Each category goes through a structured analysis that results in a score from A (very low risk) to F (critical risk).
Fire
Assess your company's fire risk with Hazadio. Complete methodology, A-F scoring, prevention and insurance coverage. Professional guide.
Learn more →Machinery fleet
Machinery safety audit and risk analysis: equipment assessment, preventive maintenance, scoring and insurance recommendations.
Learn more →Business interruption
Business interruption insurance: assess your exposure to the risk. Impact analysis, A-F scoring, recommended cover and insurance suitability.
Learn more →Civil liability
Assess your professional liability risk with Hazadio. Exposure analysis, A-F scoring, suitable coverage and regulatory compliance.
Learn more →Legal & HR
Legal audit: identify and assess your company's legal risks. Compliance, litigation, A-F scoring and suitable legal protection.
Learn more →Environmental
Environmental compliance audit: natural risks threatening your business (flooding, earthquakes) and your activity's impact on the environment (pollution).
Learn more →Why assess these 6 risk categories?
These 6 categories cover all the major risks a business can be exposed to. They are interconnected: a fire can lead to business interruption, a faulty machine can trigger the company's civil liability, and so on.
Hazadio's holistic approach identifies vulnerabilities in each area and checks that your insurance coverage matches your real risks.
A-F scoring methodology
For each category, Hazadio analyzes several criteria weighted by importance: prevention measures, regulatory compliance, protective equipment, internal organization, and more. The result is a score from A to F that lets you quickly see the level of vulnerability.
- A : Very low risk, exemplary control
- B : Low risk, good control
- C : Moderate risk, a few points of attention
- D : High risk, corrective actions recommended
- E : Very high risk, urgent actions required
- F : Critical risk, major risk situation